Past Projects

40th Avenue Interchange, Airdrie, AB


Contour Earthmoving performed the project grading for the 40th Avenue Interchange with EllisDon Construction. on this project we performed pond excavation, roadway embankment, detour construction, culvert installation and the realignment of Nose Creek

West District Pond 


Contour Earthmoving  excavated and fine graded the lined storm water retention pond for the new  West District Community by Truman Homes

Springbank Off Stream Reservoir 


​The Springbank Off-Stream Reservoir (SR1) will provide flood protection along the Elbow River in Calgary and other downstream communities as part of an overall flood mitigation system.
The SR1 project has been designed to work in tandem with the Glenmore Reservoir in Calgary to accommodate water volumes equal to the 2013 flood on the Elbow River.

We used a varity of equipment to remove the organic layers from the Dam footprint and a combination of Hitachi 850 Excavators and CAT 773 Haul Trucks with 100t wagon to construct a portion of the future Dam structure.​

Clearwater Park Community by Centron 


​Contour Earthmoving performed the rough and final grading for the new Clearwater Park community, this involve the movement of over 1 million cubic meters of topsoil and overburden excavation. borrow management and lined storm pond construction

South Shore Community by 

​
​Contour Earthmoving performed the rough and final grading for the new South Shore community in Chestermere, this involve the movement and placement of over 500,000 cubic meters of topsoil and overburden excavation 
HOME

ABOUT US



CONTACT US

CAREERS​


Call us
Photo from MININGdotcom
  • EARTHWORKS
    • About Us
  • Commercial
  • Heavy Haul
  • The Contour Advantage
  • Safety
  • Environment
  • Projects
  • Contact Us
    • Careers